Skip to main content

Workshop

It's a bit messy right now but I have the wood shop setup in the workshop area now
Built some new shelves at the entry to help get the network and whole house audio stuff out of the way.  The cabling is very temporary.
The images make it look shallow for some reason, but the room is about 12'x22'.  Very messy as I'm in the progress of building some speakers to test my woodworking skills.  If I can make them halfway decently, then that will allow me to do some build-in cabinetry in the house as well.  Though a higher priority will be to trim the new windows first.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.