Skip to main content

Window Framing

Finally getting around to framing the windows I installed a while ago.  Here is what they looked like.
Here is all the framing in place.  Unfortunately my trim paint had all dried up and it was too late to get more by the time I found out, so it is unpainted here.
I'll get paint this week and paint them in the evening.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.