Master Bedroom Usable

Have all of the major work done.  Just need to do the baseboard and window trim and some minor paint touch up.  I'll probably work on the built-ins before doing the trim.  Right now I have a small wall unit in place so I can get a feel for sizing on the built-ins I'm planning to do.  The bed frame is a temporary platform I built out of some scrap wood.




Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.