Started with 5.5 tons of Lynch Creek Basalt.
Wanted to do the upper retaining wall first, as it was simpler and I wanted to learn my lessons there.  Started with it all dug up.
And after a full day of work
Wall face is done, side not quite.  Step 2 will be a smaller wall above it and about 3' back, up to the level of the grass.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.