Skip to main content

New Lighting

The track lighting in the new master bedroom worked so well that I've decided I'm going to add track lighting to the old master bedroom and the living room.  Both of which were very dark.  Phase 1, cut out the drywall to allow wiring access.
Step 2, install preliminary connections, and a few test lights.  Also going to update the roof color from grey to light blue in the old master bedroom, so here you can see I'm filling in all of the holes.

There will be a lot more track to add.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.