Flooring Installed

Took a lot longer than expected, but getting there.  All the wood is installed.  Decided to wait till it's a little warmer out before sanding and using filler, don't want to deal with compression issues during Summer.

Decided to put the furniture back in as I'll be using this space for the next 2 months before I get to finishing.  Will be working on the stairwell next, as that will allow me to prototype my stair treads before I commit to installing them leading to the sunken area.  Though I might go ahead and install the step and tile in the sunken area, we'll see.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.