Getting the drywall done in the last bedroom/office in the basement. After this it's just the landing room and the bathroom. Actually getting decent at the drywall thing. This probably took me half the time it used to, and the end result is better joints.
Almost done. All that remains is some trim at the base of the entry windows so that they match, and final paint. The dead lighting outlet was drywalled, and I reinstalled the pipe shelving.
Getting the plinths installed in the kitchen. Trim wood installed, this also shows what it would have looked like in white, which is rather bland Painted