Skip to main content

Posts

Showing posts from 2022

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Kitchen Progress

 Backsplash tile almost done, just need to install the outlets and faceplates.

Laundry Done

 Here is a picture of the original laundry room And now

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.