Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done.

And have the primer coat.
And first sealing coat of waterproofing done one the basement bathroom
It will probably need 2-3 more coats before it's ready for inspection.



Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: