Skip to main content

Reading Nook Status

Finished the primary framing.  Will finish the interior drywall and electrical tomorrow.

The shell is made from 3/4" subfloor, and I'm putting drywall over it.  Probably overkill, but should make for a very solid, durable frame.  Most of the interior will be white drywall, but I have some left over hardwood flooring sample that has a really pretty pattern when stained and coated, I have a sample in place in the top image.  Won't be able to do the exterior drywall until I get the electrical and structural inspection done.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Accent Wall

Been meaning to add some color to the main living area for a while.