Skip to main content

Stairs Recut

Had to re-cut the stairs taking 1/8" incrementally off each step.  All but the landing are done.  The treads are still 2x8's.  I will replace them with 3/4" subfloor which will be topped with whatever tread material I end up using.

I also built some temporary scaffolding out of the scrap wood
I've already put some of the drywall up in the above picture, and finished it below.
Just one piece at the top, and one at the bottom right to do, but don't need the scaffolding for that.  I took the scaffolding apart and stored it in the bike room, as I'll have to put it back up with I do the float and tape work.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.