The rain chain on the front drain on the house was pretty much a failure. Got ugly fast, and splattered water everywhere, so I finally got around to replacing it.
Still lots of work to do in front, but needed this done before the rain starts.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.
Comments
Post a Comment