 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom.


And here is progress on the much larger bathroom, even though to overall footprint is the same size.




The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.


Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: