The house is finally air tight again.  I have one of the clerestory windows done, with the raw glass in place, the rest are framed in their final form.   The vertical window is also framed, it's now properly framed in with a good 15 degree sill angle as it's likely to get wet.  All but the one window have hard plastic in them, the same type that's used in large florescent fixtures, as it's a cheap way to get a cover that can be seen through.  This is temporary so that at least I don't have bugs coming in while I'm waiting for the rest of the glass to come in.
Doesn't look too different from the last shot but a lot of work to get it right.  Turned out I couldn't do the last open area above the door, so I had to redo the wall there, and the window above the door needed some additional framing above it as it was a junction point of the tongue and grove in the roof.  Only the outside framing is done.  I may want to integrate the inside framing with the drywall, so there are temporary blocks holding the glass in place.  It's likely it will stay this way for a while until I start doing the interior drywall.

Comments

Popular posts from this blog

Basement Painting

We're set to close on the 15th of October, so I'm getting a little braver with my fixes and updates.  I realize I want a little experience with the new airless sprayers before I tackle painting the exterior of the house.  I also know that once I pull down the ceiling tiles in the basement, I'll want something to make it look decent while I'm working on the wiring and rearranging the upstairs.  I thought I'd do a dark paint on the exposed wood.  I'd seen pictures of that done in basements before and liked the look.  The basements in this house are about 8" tall, a little lower than that when duct work or plumbing is a factor, so while not low, it can't hurt to have a dark look to improve the height of the ceiling. So, I figured I'd start by painting the ceiling in the unfinished part of the basement.  Here are some before pictures:  The paint I used was the same dark flat Olive Green I'd used on the lighting plate in the bathroom.  It...

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.