Office Door

Decided to go ahead and install the office door so that I could learn the ins and outs of the barn door hardware I bought.  Used an old hollow core external door, it's not wide enough, but it's close, and if I botched it learning it doesn't cost me anything.  It will be replaced with a proper door, but not until the flooring is done, which will be a while.

Quality of the hardware was better than I expected.  Made a few little mistakes, but nothing big.  I'll hold off on getting the real door until I know what the exact height of the flooring will be.  For now this at least allows me to keep the cat out.  I'll go ahead and order a 2nd set of hardware so that I can do the bike room.  I'll do the same and use an old door so that I can test it.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.