Decided to go ahead and install the office door so that I could learn the ins and outs of the barn door hardware I bought.  Used an old hollow core external door, it's not wide enough, but it's close, and if I botched it learning it doesn't cost me anything.  It will be replaced with a proper door, but not until the flooring is done, which will be a while.

Quality of the hardware was better than I expected.  Made a few little mistakes, but nothing big.  I'll hold off on getting the real door until I know what the exact height of the flooring will be.  For now this at least allows me to keep the cat out.  I'll go ahead and order a 2nd set of hardware so that I can do the bike room.  I'll do the same and use an old door so that I can test it.

Comments

Popular posts from this blog

Basement Painting

We're set to close on the 15th of October, so I'm getting a little braver with my fixes and updates.  I realize I want a little experience with the new airless sprayers before I tackle painting the exterior of the house.  I also know that once I pull down the ceiling tiles in the basement, I'll want something to make it look decent while I'm working on the wiring and rearranging the upstairs.  I thought I'd do a dark paint on the exposed wood.  I'd seen pictures of that done in basements before and liked the look.  The basements in this house are about 8" tall, a little lower than that when duct work or plumbing is a factor, so while not low, it can't hurt to have a dark look to improve the height of the ceiling. So, I figured I'd start by painting the ceiling in the unfinished part of the basement.  Here are some before pictures:  The paint I used was the same dark flat Olive Green I'd used on the lighting plate in the bathroom.  It...

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.