More Egress Window

Had to dig out a lot more, but finally got the permeable weed barrier in, and about 6" of leveled, crushed rock.  I've also cut 3 levels of the framing.
I have a bunch of scrap plywood and 2 doors serving to keep and dirt from caving in or rolling down while I work on the framing.  These aren't firmly bolted in place yet.  Want to have the code inspectors check it out before I firm that up.  Plus, I ran out of the framing wood, will need to get some more.