More Egress Window

Had to dig out a lot more, but finally got the permeable weed barrier in, and about 6" of leveled, crushed rock.  I've also cut 3 levels of the framing.
I have a bunch of scrap plywood and 2 doors serving to keep and dirt from caving in or rolling down while I work on the framing.  These aren't firmly bolted in place yet.  Want to have the code inspectors check it out before I firm that up.  Plus, I ran out of the framing wood, will need to get some more.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this:

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.