Landscaping Started

Started some landscaping cleanup and ended up starting the retaining wall template.

It will look a little ghetto for a while, as I'm using scrap wood to determine where the rock wall will be.  In front of it will be a sloped parking pad.  Probably just crushed rock, but I might get it asphalted. Allowing the parking pad to slope will help with drainage, as most of the water from the driveway, and a lot of rain water flows through that area.

Initially I thought I'd be digging a lot, but it turns out that I'll be adding a lot of topsoil to backfill.  The wall face will be made with 1-man and 1/2-man basalt rock, similar to this style.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this:

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.