Started with 5.5 tons of Lynch Creek Basalt.
Wanted to do the upper retaining wall first, as it was simpler and I wanted to learn my lessons there. Started with it all dug up.
And after a full day of work
Wall face is done, side not quite. Step 2 will be a smaller wall above it and about 3' back, up to the level of the grass.
Wanted to do the upper retaining wall first, as it was simpler and I wanted to learn my lessons there. Started with it all dug up.
And after a full day of work
Wall face is done, side not quite. Step 2 will be a smaller wall above it and about 3' back, up to the level of the grass.