Skip to main content

New Bike Room

Tearing down the old basement workshop so that I can finish it, and also tearing down the bike room.  I've moved the bikes themselves out into the basement landing room show here (still a big mess)

So that left enough room to redo the bike room as storage and bike tools.  I wanted to separate it from the bathroom on the other side, so I slapped up some scrap drywall.  Don't ever plan on finishing it, so the ridiculously bad drywall job is just fine.  This gives me a lot more storage space, which I'll need as the old storage workshop will be finished into a usable room.





Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: