Flooring Installed

Took a lot longer than expected, but getting there.  All the wood is installed.  Decided to wait till it's a little warmer out before sanding and using filler, don't want to deal with compression issues during Summer.

Decided to put the furniture back in as I'll be using this space for the next 2 months before I get to finishing.  Will be working on the stairwell next, as that will allow me to prototype my stair treads before I commit to installing them leading to the sunken area.  Though I might go ahead and install the step and tile in the sunken area, we'll see.

Comments

Popular posts from this blog

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Back Wall Done

 Finally 100% done with the back wall of the house.  Windows installed, trim done, and paint. The windows will probably get pretty messy until I have time to install the edging and river rock along the edge, but that will come later.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.