Flooring Installed

Took a lot longer than expected, but getting there.  All the wood is installed.  Decided to wait till it's a little warmer out before sanding and using filler, don't want to deal with compression issues during Summer.

Decided to put the furniture back in as I'll be using this space for the next 2 months before I get to finishing.  Will be working on the stairwell next, as that will allow me to prototype my stair treads before I commit to installing them leading to the sunken area.  Though I might go ahead and install the step and tile in the sunken area, we'll see.

Comments

Popular posts from this blog

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.