So that I can use the rest of the flooring I have, and move it out of the house, I need to finish the stairwell next.  The first step was installing the backer board on the outside wall.  It's all mortared in with concrete screws embedded in it.
The next step will be to remove the temporary treads and install subflooring treads, after that I can build the surface treads using the white oak flooring.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: