 All of the windows are in, and I'm starting to sand and paint the trim.  Exterior still needs some cover trim, and is still the primered white color, that will all be painted to match the same dark color.


I added some Costco LED string lights to and existing circuit, and strung them between the rafters outside.  Not sure if I'll keep them or not, looks a bit messy when they are off, but it's pretty when they are on.
Also finally patched the original stove vent hole, and the smaller plumbing hole in the ceiling.  Filled it with foam so that it was properly insulated and then glued and nailed in replacement wood after cutting the rough round hole into a clean square hole.  The plumbing hole I just filled with a round plug I filed down to fit.
That will all get filled, sanded, and then painted.


Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.