Floors Done

 Finally did all of the sanding and finishing of the floors.  This is a huge step as it allows me to finally finish everything else upstairs.

Here it is fully sanded and waiting for sealer



Applying the sealer.  I'm using Loba Invisible Protect 2k.  2 coats as recommended


2nd coat


You can really see a big difference between how the wood reacted after the first coat.  It looked as if a significant tint was going to be imparted to the wood.  But after it dried, that went away.  The 2nd coat shows less affect, showing that it's sitting on top of the first coat.

Final result



The Loba turned out great, only adding a very slight tint to the flooring.  I was surprised at how much the grain raised after the first coat.  But as the instructions required, I buffed with a 200 grit screen between coats.


Comments

Popular posts from this blog

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Back Wall Done

 Finally 100% done with the back wall of the house.  Windows installed, trim done, and paint. The windows will probably get pretty messy until I have time to install the edging and river rock along the edge, but that will come later.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.