Cabinets all done, just needs the toe-kick panels installed. Starting to install the dishwasher. Due to a 1/2" measuring error, I get to pull all the base cabinets out and re-install them.
Day 1 of tiling the kitchen/bath/laundry. It's such an irregularly shaped area, with one-door access to the laundry and 1/2 bath, I'm sure this is going to take a while.