Cabinets Done, Dishwasher Started

Cabinets all done, just needs the toe-kick panels installed. Starting to install the dishwasher.  Due to a 1/2" measuring error, I get to pull all the base cabinets out and re-install them.

Cabinets Almost Done

Almost done with the wall of cabinets.  Just need a few more handles, and need to build the custom trim around the refrigerator.

Refrigerator and Freezer

Finally have them together an in place, should have the cabinets done in about 2 weeks.

Laundry Room Done (mostly)

Just need to put in the plinth trim, and refinish the two walnut shelves and she's all done.

Tile Work Sucks

Takes a long time to do tile....

Tile Progress

Tile takes a lot longer than I expected.

Tile Begins

Day 1 of tiling the kitchen/bath/laundry.  It's such an irregularly shaped area, with one-door access to the laundry and 1/2 bath, I'm sure this is going to take a while.