Day 1 of tiling the kitchen/bath/laundry. It's such an irregularly shaped area, with one-door access to the laundry and 1/2 bath, I'm sure this is going to take a while.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
Comments
Post a Comment