Finally got some good weather and painted the garage.  Not quite done in this picture, need to touch up the paint where the colors meet, but 2 good solid coats are on it.  Still need to work on the back and get the wiring done, opener installed, etc...
You can also see some fresh paint on the base of the front of the house where I moved the cable wire so that it wasn't running across the whole front of the house, but never got around to fixing the paint.

Comments

Popular posts from this blog

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.