Skip to main content

Stairs Back In

Finally got my stairs back.  This time the framing is in final form, but with 2x12's as steps.
Now has 3 stringers, and a landing box for the landing, which acts as the final step.  Not sure what I'll end up using for the treads, considering hardwood or slate, but that may depend on what I use for flooring in the kitchen.  Need to add a flew planks to finish it.  I might go ahead and put some tread faces on so the dog can get used to using the stairs, which may or may not be a good idea.

Comments

Popular posts from this blog

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Back Wall Done

 Finally 100% done with the back wall of the house.  Windows installed, trim done, and paint. The windows will probably get pretty messy until I have time to install the edging and river rock along the edge, but that will come later.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.