Front Wall

Needed to remove the front window and frame it before I could finish the laundry or kitchen framing and drywall, so I decided to go ahead and tackle the front wall of the house.  After several mockups I arrived at this:
So I started by tearing off all of the front.
As of Sunday I'm at this point and calling it a weekend, other than tacking up some plastic to cover the holes.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.