Front Wall

Needed to remove the front window and frame it before I could finish the laundry or kitchen framing and drywall, so I decided to go ahead and tackle the front wall of the house.  After several mockups I arrived at this:
So I started by tearing off all of the front.
As of Sunday I'm at this point and calling it a weekend, other than tacking up some plastic to cover the holes.

Comments

Popular posts from this blog

Figuring out a plan for the sunken area, cleared it all out.  Will likely need to deal with the chimney first.

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.