Siding

Almost done.  My math was off by about 3" on the top, so I'll need one more plank across the top, cut down.  Then some trim around the windows.  Also, I can't put the one last lower plank in until I fill the old window hold with cinder blocks.  But the look is almost complete.
Compared to what it used to look like (this is just about the same angle).
I also plan to pull up the bushes in front and replace them with more Japanese Blood Grass like the two I've planted near the entry door.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.