Pretty Much Done

About 99% done with the shelving.  Just a little fine-tuning to do.  Had the last minute idea to store the ladder in there, but it didn't fit so I'll have to tweek that section a little to make room for it, then I want to add one or two more cross slats and it should be done.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.