Memorial Day Demo

Decided I finally needed to take care of that ugly bathroom in the basement.

Needed to fully demolish it so that I could figure out the plumbing I'll need to do for the upstairs laundry room as well as this bathroom.  Rebuilding this bathroom is likely going to be one of the last things I do, so it will probably be like this for a year or more.  Not a big loss, as it was really horrible.

Here it is all cleaned up.  Using that bathroom space for tool storage for now.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: