Memorial Day Demo

Decided I finally needed to take care of that ugly bathroom in the basement.

Needed to fully demolish it so that I could figure out the plumbing I'll need to do for the upstairs laundry room as well as this bathroom.  Rebuilding this bathroom is likely going to be one of the last things I do, so it will probably be like this for a year or more.  Not a big loss, as it was really horrible.

Here it is all cleaned up.  Using that bathroom space for tool storage for now.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.