Decided I finally needed to take care of that ugly bathroom in the basement.

Needed to fully demolish it so that I could figure out the plumbing I'll need to do for the upstairs laundry room as well as this bathroom.  Rebuilding this bathroom is likely going to be one of the last things I do, so it will probably be like this for a year or more.  Not a big loss, as it was really horrible.

Here it is all cleaned up.  Using that bathroom space for tool storage for now.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.