Skip to main content

Workshop

It's a bit messy right now but I have the wood shop setup in the workshop area now
Built some new shelves at the entry to help get the network and whole house audio stuff out of the way.  The cabling is very temporary.
The images make it look shallow for some reason, but the room is about 12'x22'.  Very messy as I'm in the progress of building some speakers to test my woodworking skills.  If I can make them halfway decently, then that will allow me to do some build-in cabinetry in the house as well.  Though a higher priority will be to trim the new windows first.

Comments

Popular posts from this blog

Figuring out a plan for the sunken area, cleared it all out.  Will likely need to deal with the chimney first.

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.