No Pics

Nothing worth taking pictures of.  Did some more wiring, got the dedicated 20amp line to the workshop done.  I think I'm going to have an electrician put a new breaker panel in for me, as I'm not wild about the "snug" wiring in the current box, and I know I'll have to put a few more lines into it.  Better to just have a safer, box, and one with a main cutoff.

Also got the last big piece of drywall up in the half bath.  I'll take pics when I do the float and tape this week.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.