Skip to main content

Back Yard

Started cleaning up the back yard.  Removed a few bushes to expose the ferns, then realized that it looked really good, so I ended up pulling out a lot of plants to leave the ferns alone.  I've also stacked the beams that are going to be cut to make the egress window well, and since I plan to use those beams as well for the rear retaining wall, I took a picture, as this gives some idea of what the rear patio will look like when I'm done.
I've pruned some of the dead fern fronds, but haven't finished cleaned up yet.  The ferns are thin right now because they were buried in all the other brush before I pulled it out.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.