Skip to main content

Done for the weekend

Time for a shower, won't be using the kitchen for a little while
If you look closely you can see little sticks stuck to the kitchen floor.  These mark the level point for the base of the cabinets.  I've started the cabinet base framing, and directing the vents.  There's a pretty significant drop of 1/2" from the edge of the wall to the end of the islands, so I'll be doing a fair amount of work to get those level, but it shouldn't be too hard.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: