Big Mess

In the middle of a lot of projects, so the house is a big mess right now
Got all of the upstairs electrical done, including doing the 220v for the oven.
And got it all inspected, so now I can finally start putting the cabinets in.  They are in a cheap white for now, not sure if I'll stick with white or not.
The oven is also just the old one stuffed into place, and not the correct 30" size.  Need to start thinking seriously about cabinet face type so I can pick a matching oven.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.