In the middle of a lot of projects, so the house is a big mess right now
Got all of the upstairs electrical done, including doing the 220v for the oven.
And got it all inspected, so now I can finally start putting the cabinets in.  They are in a cheap white for now, not sure if I'll stick with white or not.
The oven is also just the old one stuffed into place, and not the correct 30" size.  Need to start thinking seriously about cabinet face type so I can pick a matching oven.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.