Ceiling and Office

Got the ceiling painted in the theater room


, and 2 test fascia beams put in.
The beams didn't turn out as well as I'd like, I'll experiment with some other options.  The trim hasn't been installed on the ceiling yet, that is next.

I also got the new wall units, and desks installed in the office.  I decided to move the library upstairs and the office downstairs.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: