Skip to main content

Ceiling and Office

Got the ceiling painted in the theater room


, and 2 test fascia beams put in.
The beams didn't turn out as well as I'd like, I'll experiment with some other options.  The trim hasn't been installed on the ceiling yet, that is next.

I also got the new wall units, and desks installed in the office.  I decided to move the library upstairs and the office downstairs.

Comments

Popular posts from this blog

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Paint

Had to get a coat of paint on before the rains hit.  Not completely sold on the blue trim, may due a dark brown or grey there instead, but a huge improvement over what it was.  Right now I only have one coat on, and haven't done the edging right, so it's a rough paint job, but it will tide the house over until I get a patch of good weather and can finish the job.
Figuring out a plan for the sunken area, cleared it all out.  Will likely need to deal with the chimney first.