Ceiling and Office

Got the ceiling painted in the theater room


, and 2 test fascia beams put in.
The beams didn't turn out as well as I'd like, I'll experiment with some other options.  The trim hasn't been installed on the ceiling yet, that is next.

I also got the new wall units, and desks installed in the office.  I decided to move the library upstairs and the office downstairs.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Back Wall Done

 Finally 100% done with the back wall of the house.  Windows installed, trim done, and paint. The windows will probably get pretty messy until I have time to install the edging and river rock along the edge, but that will come later.