Skip to main content

Ceiling and Office

Got the ceiling painted in the theater room


, and 2 test fascia beams put in.
The beams didn't turn out as well as I'd like, I'll experiment with some other options.  The trim hasn't been installed on the ceiling yet, that is next.

I also got the new wall units, and desks installed in the office.  I decided to move the library upstairs and the office downstairs.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.