Have all of the major work done. Just need to do the baseboard and window trim and some minor paint touch up. I'll probably work on the built-ins before doing the trim. Right now I have a small wall unit in place so I can get a feel for sizing on the built-ins I'm planning to do. The bed frame is a temporary platform I built out of some scrap wood.
Got all of the wiring done in the master bedroom. I will probably hold off on the carpet for a while. Need to figure out what carpet I want and need to determine what built-ins I need to create. I've pulled up one of the wall units from downstairs. I'll live with this for now, determine if having a wall unit or built ins works there.
Not my strong suit. Results look good, but took me forever to get there. Next up, wire in the outlets and switches, trim around the doors, and then built-ins
Got the ceiling and beam paint done (minus some minor touch-up), and the drywall sanding is almost done. Should have it done this weekend and start on the built-ins.