Got the ceiling and beam paint done (minus some minor touch-up), and the drywall sanding is almost done. Should have it done this weekend and start on the built-ins.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
First coat of paint on in the basement listening room. Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: