Skip to main content

Master Bedroom Usable

Have all of the major work done.  Just need to do the baseboard and window trim and some minor paint touch up.  I'll probably work on the built-ins before doing the trim.  Right now I have a small wall unit in place so I can get a feel for sizing on the built-ins I'm planning to do.  The bed frame is a temporary platform I built out of some scrap wood.




Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: