Skip to main content

Final Room Framing

Started framing the last room in the house, the prior workshop
Got it about 90% done and ran out of steam.

The framing on the West side of the room is for the closet for the bedroom on the other side, and for a small closet / equipment room for this room.

Also got a door for this small closet and a replacement for the water damaged door upstairs ordered, I'll pick them up next weekend.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: