Final Room Framing

Started framing the last room in the house, the prior workshop
Got it about 90% done and ran out of steam.

The framing on the West side of the room is for the closet for the bedroom on the other side, and for a small closet / equipment room for this room.

Also got a door for this small closet and a replacement for the water damaged door upstairs ordered, I'll pick them up next weekend.

Comments

Popular posts from this blog

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Back Wall Done

 Finally 100% done with the back wall of the house.  Windows installed, trim done, and paint. The windows will probably get pretty messy until I have time to install the edging and river rock along the edge, but that will come later.
Figuring out a plan for the sunken area, cleared it all out.  Will likely need to deal with the chimney first.