Drywall Going Up

Almost 100% of the drywall is up in the "Listening Room".  It will be setup as a stereo room, complete with isolated circuit with hospital grade outlet. To be honest, I don't really need it, but it makes for an attractive space which could enhance resale value.


The back wall will be a rock veneer, so it won't get drywall, instead it will get backer board, but I won't put that up till the mudding is done.  Have about 2 minor pieces left to finish up this room.

Also, since this includes drywall work in the basement bedroom, I needed to clean up the spare room and turn it into temporary storage so I have a place to keep all the stuff that will go into these rooms.


Comments

Popular posts from this blog

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.