Drywall Going Up

Almost 100% of the drywall is up in the "Listening Room".  It will be setup as a stereo room, complete with isolated circuit with hospital grade outlet. To be honest, I don't really need it, but it makes for an attractive space which could enhance resale value.


The back wall will be a rock veneer, so it won't get drywall, instead it will get backer board, but I won't put that up till the mudding is done.  Have about 2 minor pieces left to finish up this room.

Also, since this includes drywall work in the basement bedroom, I needed to clean up the spare room and turn it into temporary storage so I have a place to keep all the stuff that will go into these rooms.


Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: