Skip to main content

Drywall Going Up

Almost 100% of the drywall is up in the "Listening Room".  It will be setup as a stereo room, complete with isolated circuit with hospital grade outlet. To be honest, I don't really need it, but it makes for an attractive space which could enhance resale value.


The back wall will be a rock veneer, so it won't get drywall, instead it will get backer board, but I won't put that up till the mudding is done.  Have about 2 minor pieces left to finish up this room.

Also, since this includes drywall work in the basement bedroom, I needed to clean up the spare room and turn it into temporary storage so I have a place to keep all the stuff that will go into these rooms.


Comments

Popular posts from this blog

Figuring out a plan for the sunken area, cleared it all out.  Will likely need to deal with the chimney first.

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.