Skip to main content

Basement Windows

Installed the last 3 basement windows.  Now every window in the basement has been replaced.  Gone are the drafty old aluminum windows.
In are the new double pane windows.





The outside trim will come later. I sold my old table saw a while ago so that I could get a more portable model, and I haven't done that yet.  Once I get the table saw I'll be able to do the trim.

This does allow me to finish the drywall in the basement though, which is my next priority.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: