Skip to main content

Basement Windows

Installed the last 3 basement windows.  Now every window in the basement has been replaced.  Gone are the drafty old aluminum windows.
In are the new double pane windows.





The outside trim will come later. I sold my old table saw a while ago so that I could get a more portable model, and I haven't done that yet.  Once I get the table saw I'll be able to do the trim.

This does allow me to finish the drywall in the basement though, which is my next priority.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.