Catching Up

Been too busy to post, need to catch up.  

Office drywall finished.

Originally I started installing the removable ceiling
But decided it wasn't worth the fuss and the result wouldn't look good enough, so I leveled the beams and installed drywall, which is ready for sanding now
It will be painted dark to match the rest of the basement, and have trim moulding around the edge to hide the transition.

Also chose to frame and drywall the last wall in the landing area







Comments

Popular posts from this blog

Paint

Had to get a coat of paint on before the rains hit.  Not completely sold on the blue trim, may due a dark brown or grey there instead, but a huge improvement over what it was.  Right now I only have one coat on, and haven't done the edging right, so it's a rough paint job, but it will tide the house over until I get a patch of good weather and can finish the job.

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.
Figuring out a plan for the sunken area, cleared it all out.  Will likely need to deal with the chimney first.