Catching Up

Been too busy to post, need to catch up.  

Office drywall finished.

Originally I started installing the removable ceiling
But decided it wasn't worth the fuss and the result wouldn't look good enough, so I leveled the beams and installed drywall, which is ready for sanding now
It will be painted dark to match the rest of the basement, and have trim moulding around the edge to hide the transition.

Also chose to frame and drywall the last wall in the landing area







Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: