Skip to main content

Catching Up

Been too busy to post, need to catch up.  

Office drywall finished.

Originally I started installing the removable ceiling
But decided it wasn't worth the fuss and the result wouldn't look good enough, so I leveled the beams and installed drywall, which is ready for sanding now
It will be painted dark to match the rest of the basement, and have trim moulding around the edge to hide the transition.

Also chose to frame and drywall the last wall in the landing area







Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.