Tile Progress

Tile takes a lot longer than I expected.

Tile Begins

Day 1 of tiling the kitchen/bath/laundry.  It's such an irregularly shaped area, with one-door access to the laundry and 1/2 bath, I'm sure this is going to take a while.

Garage Cabinets

The original cabinets I ordered for the laundry room (prematurely) years ago, weren't going to work there.  So I was able to reuse them in the garage.  Used all but one 15" cabinet.

Ready for Tile, Clerestory Windows

Backer board installed, being slow getting started on the tile. Also started on installing the living room clerestory windows

Reliable Old Wagon

The beater c320 wagon keeps proving its usefulness.

First Cabinets

Butcher block is temporary, and cut over sized.  When done the edges will line up.  But these are the first cabinets installed in the kitchen.  After this I do the laundry room and the half bath cabinets.  May need to install the tile before doing the half bath, we'll see. These needed and extra high base to clear the HVAC intake.  I have the old grille there temporarily just to over the hole.  I'll get a better one later after the tile is in and I can do the kick panel covers.

Drywall and Ceiling Getting Done

Not quite 100% but lots of progress