First Cabinets

Butcher block is temporary, and cut over sized.  When done the edges will line up.  But these are the first cabinets installed in the kitchen.  After this I do the laundry room and the half bath cabinets.  May need to install the tile before doing the half bath, we'll see.
These needed and extra high base to clear the HVAC intake.  I have the old grille there temporarily just to over the hole.  I'll get a better one later after the tile is in and I can do the kick panel covers.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.