Skip to main content

First Cabinets

Butcher block is temporary, and cut over sized.  When done the edges will line up.  But these are the first cabinets installed in the kitchen.  After this I do the laundry room and the half bath cabinets.  May need to install the tile before doing the half bath, we'll see.
These needed and extra high base to clear the HVAC intake.  I have the old grille there temporarily just to over the hole.  I'll get a better one later after the tile is in and I can do the kick panel covers.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: