Living Room

Getting started on the living room.  I've started installing new shelves in the fireplace alcove, and a floating wall unit as an entertainment center.  There are 3 more shelves that I need to install in the fireplace alcove.  In this picture there is only one so far.

Eventually all of the electronics will be hidden behind the doors with IR repeaters so that I can operate them without seeing them.  There will be doors on all of the cabinets when done.  I'll also work on getting some in-wall speakers, but for now I'll have cables draped around.

Comments

Popular posts from this blog

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Back Wall Done

 Finally 100% done with the back wall of the house.  Windows installed, trim done, and paint. The windows will probably get pretty messy until I have time to install the edging and river rock along the edge, but that will come later.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.