Temporary stairs are in. Final stairs will be 42" wide. Currently I have 36" treads at the top until I move the support wall and put the new one in place. The lower treads are 42" so that I can get a feel for sizing.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.
Comments
Post a Comment