Temporary stairs are in. Final stairs will be 42" wide. Currently I have 36" treads at the top until I move the support wall and put the new one in place. The lower treads are 42" so that I can get a feel for sizing.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
First coat of paint on in the basement listening room. Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this:
Comments
Post a Comment