Got a free sofa from a coworker. I will serve as a temporary sofa until I finish more of the renovation. The current red one will get sent down into the theater once I finish the drywall down there.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.
Comments
Post a Comment