More Basement Work

Finished up the framing of the basement bathroom, including installing the sliding door and drywall.  I also finished the final landing platform.
While I was at it I finished some framing and drywall on the stairway storage area.
I threw on a little joint compound to fill the larger gaps.  Not intended to by any final float quality, just to fill the big gaps.

Comments

Popular posts from this blog

Craigslist Find

I'm still using a lot of old Ikea Expedit stuff for storage.  It works, and is flexible, but not fancy.  Been on the lookout for something better.  Ran across this on CL for only $300, and got them to deliver. Right now it's just staged in the open area of the basement.  I should be able to finish the framing and drywall in the old theater, and I'll move these in there.

Paint

Had to get a coat of paint on before the rains hit.  Not completely sold on the blue trim, may due a dark brown or grey there instead, but a huge improvement over what it was.  Right now I only have one coat on, and haven't done the edging right, so it's a rough paint job, but it will tide the house over until I get a patch of good weather and can finish the job.

Patio Demo

Wanted to get a good exposure to the foundation so I could verify the seal (think I found a leak in the planter box where the foundation meets), so I decided to tackle getting the rear concrete pad broken up.  Quotes to do the job were in the $5k range, so I decided I'd break it up and move it myself.  Removal then is only $650. Rented a breaker from HomeDepot.  Took about 6-7hrs of work, and a lot of Ibuprofin.  Went from this: To this: I am planning on taking at least a week of picking at it to move everything.