More Basement Work

Finished up the framing of the basement bathroom, including installing the sliding door and drywall.  I also finished the final landing platform.
While I was at it I finished some framing and drywall on the stairway storage area.
I threw on a little joint compound to fill the larger gaps.  Not intended to by any final float quality, just to fill the big gaps.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: